Have questions about hardwood floor refinishing, installation, sanding, LVP, or LVT?
Here are clear answers from Signature Hardwood Flooring.
We provide hardwood floor sanding, refinishing, restoration, and installation. We also install solid hardwood, engineered hardwood, luxury vinyl plank (LVP), and luxury vinyl tile (LVT).
Most hardwood floors need refinishing every 7 to 10 years, depending on foot traffic and wear. Regular maintenance can help extend that timeline.
Sanding removes the top layer of wood to eliminate scratches, surface wear, and other imperfections. We use professional equipment to create a smooth, even surface that is ready for stain and finish.
Most hardwood floor refinishing projects take 3 to 7 days. The timeline depends on the size of the area and the number of finish coats required.
In many cases, yes. We take steps to reduce dust and fumes, but we recommend staying out of the work area for safety and comfort. Most homeowners are able to remain in the home during the refinishing process.
We install solid hardwood, engineered hardwood, LVP, and LVT. We can help you choose the right flooring based on your space, style, and budget.
Yes. We provide flooring samples so you can compare options at home, and we also have a showroom where you can view different products in person.
Pricing depends on the type of service, the size of the area, and the materials used. We provide free estimates so you can get a quote based on your specific project.
Sweep or vacuum regularly to remove dirt and grit. Use a damp mop with a pH-neutral hardwood floor cleaner, and avoid excess water or harsh chemicals. We often recommend Bona products because they are designed for hardwood floors.
Yes. We offer free on-site estimates for all flooring services. Every estimate is tailored to the project and the conditions in your home.
Yes. Signature Hardwood Flooring is fully licensed and insured.
Buffing, often called a screen and recoat, lightly abrades the top layer of finish to remove minor surface scratches and restore shine. Full refinishing sands the floor down to bare wood so deeper damage can be addressed and the color can be changed if needed.
Often, yes. Minor water damage and deep gouges can sometimes be repaired by replacing individual boards before sanding and refinishing. If the damage is more severe, we will let you know whether a larger repair or full replacement makes more sense.
Yes. During sanding, we remove the old finish and take the floor down to bare wood. That gives you the option to choose a new stain color.
For most homes with pets, LVP is the more pet-friendly option because it is more scratch-resistant and water-resistant than hardwood. If you prefer real wood, harder species such as oak and durable high-traffic water-based finishes can help.
We can handle the full project, including sourcing materials and completing the installation or finishing work. If you have already purchased your flooring, we can also provide a labor-only installation quote.
We take cleanup seriously. During sanding, we use HEPA-filtered vacuums and dust containment systems, and we finish with a walkthrough to make sure debris is removed from the work area.
Water-based finishes dry faster, usually in 4 to 6 hours, have lower odor, and stay clearer over time. Oil-based finishes take longer to dry, usually 16 to 24 hours, have a stronger smell during application, and develop a warmer amber tone as they age.
Small gaps in winter are normal. Wood naturally shrinks when indoor air becomes dry and expands again when humidity rises in warmer months.
LVP and LVT are made from the same type of durable material. The main difference is appearance. LVP is designed to look like wood planks, while LVT is designed to look like stone or tile.
Yes. We offer demolition services, including the removal and disposal of carpet, padding, tack strips, and ceramic tile. Additional fees may apply depending on the scope of the demo.
Furniture and rugs should be removed from the work area before the project begins. We can discuss moving certain heavy items during your consultation for an additional fee.
No sanding process is completely dust-free, but we use high-efficiency dust containment systems that capture most of the dust. This helps reduce cleanup and can help protect your HVAC system.
Yes. Solid hardwood should sit in your home for several days before installation so it can adjust to the indoor humidity and temperature. We typically deliver the material about one week before the project start date.
We do not recommend solid hardwood in basements or full bathrooms because of moisture exposure. LVP and LVT are better waterproof options for those spaces. In some basement applications, engineered hardwood may also be an option.




